Summary:

  • Benejúzar starts the 2025/2026 school year with ‍major upgrades across three educational centers.
  • Escuela ⁣Infantil Municipal to undergo extensive remodeling with energy-efficient installations.
  • CEIP Antonio Sequeros introduces inclusive playgrounds‌ and improved accessibility thanks to participatory budgeting.
  • IES Benejúzar to benefit from a new climate control ‌and ventilation system.
  • Family-amiable initiatives such as Aula Matinal and ​escuela de ‌Septiembre continue​ to support working parents.

Major ​Investments Elevate Benejúzar’s Educational Infrastructure for 2025/2026

The⁢ municipality of Benejúzar officially kicked‍ off the⁣ 2025/2026 academic​ year with significant‍ improvements across​ its three ⁣main educational institutions. In a ceremony attended by Mayor Vicente cases and Education Councilor Patricia Rodes,detailed plans and ongoing projects‍ aimed⁢ at enhancing quality,accessibility,and ​sustainability in local schools were presented.

Complete Renovations at the Escuela Infantil ​Municipal

The Escuela Infantil Municipal ​ is ⁤set to​ undergo a complete transformation. The enterprising remodeling plan will upgrade both interior and exterior areas⁤ to⁤ meet modern standards. Key features include:

  • Expansion from four to ‍five classrooms, ‍each ⁢equipped with⁢ changing zones and connected restrooms.
  • Addition of a multipurpose pavilion serving as a teachers’⁤ room and administrative offices.
  • Installation of a dedicated kitchen ​and dining⁣ area within the facility.
  • Creation of an inclusive, ⁢sensory-friendly outdoor playground.
  • Incorporation of cutting-edge energy solutions such as solar panels,⁣ aerothermal heating, and‍ radiant​ floor heating.

this €680,000 ⁣project is‌ funded by the Diputación​ de Alicante⁣ with a significant co-investment of €227,000 by the Benejúzar City ‍Council. The initiative not only improves educational spaces but commits the center to sustainability and energy efficiency, setting a benchmark​ for environmentally conscious public buildings.

Inclusive Playgrounds and ⁣Accessibility Improvements at CEIP⁣ Antonio Sequeros

Primary ​school students at CEIP ⁤Antonio Sequeros will soon see the⁤ completion of the ​first phase of an ​inclusive‍ playground terracing project. Supported by a participatory budgeting process with a €25,000‍ allocation, this innovative playground will feature:

  • Gentle slopes connecting different ⁤areas of the yard, designed to aid accessibility for children with mobility⁢ challenges.
  • Interactive play elements and shock-absorbing ‌flooring to ensure safety and fun.
  • Open spaces that combine education and⁤ recreation, fostering social inclusion.

Mayor Cases‌ emphasized ⁣that ⁢this improvement reflects‍ the community’s growing commitment to equal opportunities and inclusive education.

Modern Climate Control Upgrades at⁢ IES‍ Benejúzar

At the secondary school level, the⁢ IES Benejúzar will soon benefit from a modernized climate and ventilation system. ⁤The project includes:

  • Installation​ of ⁢advanced air⁢ conditioning units to improve classroom comfort.
  • Electrical network upgrades ‍to ⁣meet increased energy needs.
  • Enhanced⁣ air quality and ‌temperature​ regulation to optimize learning conditions.

The City ⁤Council has allocated approximately €19,174 to design and execute this technical ⁢project,⁣ which is poised ​to bring a significant qualitative ​boost to the institute’s ⁢educational environment.

Supporting Families with‌ Flexible Learning⁣ and Care Services

Recognizing the importance of work-life balance, Benejúzar continues to support families ‌through​ municipal⁢ programs such as:

  • Aula⁣ Matinal: A morning care service from 7:30 to 9:00 AM ⁤available for children aged ⁤3 to 12,‌ with 48 students⁢ currently enrolled this year.
  • Escuela de Septiembre: A free program during the first⁤ week of September that offered care⁤ for 81 children, easing the transition between⁤ summer and the school year.

According to Education Councilor patricia Rodes, such initiatives are ​crucial in helping⁢ families juggle employment and childcare responsibilities.

Summary Table of 2025/2026 Benejúzar School ​Projects

School Main Upgrades Budget Completion
Escuela Infantil Municipal New classrooms,‌ kitchen, multipurpose pavilion, solar energy systems €907,000 (Diputación ⁢+ City council) Ongoing (near future)
CEIP‌ Antonio Sequeros inclusive playground terracing and accessibility⁢ ramp €25,000 Near completion
IES Benejúzar Climate control & ventilation system, electrical upgrades €19,174 Planned​ soon

Commitment⁣ Beyond Buildings: Education as ⁤a Pillar‌ for Equality

In​ closing, Mayor Vicente Cases ​reaffirmed that these upgrades and new ⁣services reflect Benejúzar’s unwavering commitment to ⁢fostering ​an educational system‍ that ⁢promotes equal opportunities and supports community progress. From early childhood ‌education to secondary schooling, and from infrastructure to family services, ‌the municipality continues to invest⁣ in its future leaders.

With these modernization projects underway, Benejúzar is not⁤ just responding‌ to the present ⁤needs of its⁤ students and families but paving the way ⁤for a⁢ brighter, more inclusive, and enduring educational future.


sources:

Share your love