Summary

  • The UTE CV-95 Torrevieja has been proposed for the project to expand the CV-95 road.
  • The project is budgeted at €132,374, which is 21% less than the initial bidding price.
  • Work will cover approximately 870 meters, including bike and pedestrian pathways.
  • The CV-95 is a vital connection between Orihuela and the Vega Baja coast.
  • Community members have been long advocating for this infrastructure improvement.

Plans for the CV-95 Expansion in Torrevieja Are Advancing

The long-awaited expansion of the CV-95 highway in Torrevieja, located directly in front of the Torrevieja Hospital, is moving closer to becoming a reality. The contracting committee has put forth a proposal to award the project to UTE CV-95 Torrevieja, a company established specifically for this task. This company excelled in the evaluation process, outpacing four other contenders vying for the contract.

Project Details

  • Budget: The project’s total cost is set at €132,374, which marks a significant saving of 21% compared to the original bidding price.
  • Length: The expansion will cover approximately 870 meters.
  • Features:

– Duplication of the existing CV-95 road.
– Adaptation of roundabouts to accommodate the new lanes.
– Inclusion of dedicated cycling and pedestrian pathways.
– Installation of necessary protective barriers and integrated noise-reduction measures.

Furthermore, the project will enhance drainage along this stretch of road and modify existing utilities such as telephone lines, sewage systems, and potable water networks to align with the new road configurations.

Importance of the CV-95 Road

The CV-95 is highly significant as it serves as the main artery connecting Orihuela with the coastal region, traversing a large portion of the Vega Baja. The urgent need for improvements to this highway has been expressed not only by local residents but also by business owners and various community groups.

Future Prospects

While there is currently no established date for the project’s commencement, the Consell has committed to continue conducting studies and evaluating various options. Their aim is to ensure that the community’s needs are met while enhancing this crucial infrastructure.

In conclusion, the progression towards the CV-95 expansion reflects both the demand for improved local transport and the desire for safer, more accessible pathways for all road users. As studies and preparations move forward, the community’s patience and advocacy remain pivotal to turning these plans into action.

For more information, you can visit the source: Alicante Plaza

Share your love