Summary:

  • The Popular Party in Torrevieja urges the Ministry of Transport to speed up the N-332 ⁤highway⁣ expansion project.
  • The⁢ party requests prompt licensing⁤ of the preliminary project and environmental impact studies for the remaining section.
  • Calls for inclusion of funding ⁢for the 7.68 km road expansion in⁢ Spain’s 2026 national budget.
  • Current ​traffic congestion on the N-332 causes meaningful daily jams, especially during summer.
  • The regional government shows willingness to collaborate to expedite necessary⁤ permits and studies.

Popular Party Pushes ⁤for Urgent Expansion of the N-332 Road in Torrevieja

Traffic ⁤congestion along the N-332 highway in‌ Torrevieja has long been a ⁣concern for residents and local authorities. Recently, the Popular party (Partido Popular – PP) has taken⁤ an active stance, demanding that the‍ Spanish Ministry of transport, Mobility and Urban Agenda accelerates ⁣the procedures for widening (desdoblamiento) the key road stretch passing through the‌ town. This‍ move aims to ease the increasingly frequent ‍traffic ‌jams and enhance connectivity with vital local routes.

urgency​ to⁣ move Forward ‌with Project Licensing and Planning

Rosario martínez Chazarra, spokesperson for the PP in Torrevieja’s City Council, presented a motion to urge the ministry to:

  • Quickly tender the preliminary design​ project and environmental impact assessments for the portion of the N-332 currently excluded from planning.
  • Deliver the full construction project plans to Torrevieja’s City Council to integrate ​specific connectivity needs.

These connectivity needs include improved links to:

  • CV-95 road
  • Torrevieja⁣ Hospital
  • Salinas area access
  • CV-905 route

By involving the City Council early⁢ in the planning stages, the community’s logistical and safety concerns can be better addressed.

Unmet Government Promises and ​Calls for Funding

Martínez Chazarra reminded that the Spanish Minister of Transport, Óscar puente, had previously committed to licensing the first section of the expansion project⁢ by 2025. However, as of mid-2024, no significant progress has ⁢been made, leaving the project in limbo.

In addition⁤ to expedited project approval, the Popular Party requests that the ​Spanish Government ‌include a specific budget allocation for the N-332’s ⁤desdoblamiento in the 2026⁤ General State Budget. The expansion‌ covers about‌ 7.68 kilometers of the road through Torrevieja, making ​this a ample investment aimed at addressing the chronic congestion issues.

Chronic⁣ traffic Jams During Peak ⁢Seasons

The N-332 has become synonymous with daily traffic backups,‌ especially during the busy ⁤summer months when tourism ‍surges. This congestion affects both commuters⁣ and local residents, disrupting daily life and placing economic pressure on the region. The Popular Party highlighted ​how these jams often turn⁤ into outright gridlocks, ​with ‌no new‌ government initiatives ‌to ​alleviate the​ situation so far.

Regional Cooperation to Accelerate the Project

On a positive note, the⁤ Conselleria de Medio Ambiente, Agua, Infraestructuras y Territorio (Valencian regional government department) has expressed its willingness to‌ cooperate with the Torrevieja City Council.As the regional government manages the CV-95 and CV-905 roads,their support is critical to streamlining‌ the environmental,infrastructure,and administrative ⁣permits needed to move the project forward swiftly.

Benefits Expected from the N-332 Expansion

Key Benefit Description
Reduced Traffic Congestion Smoother flow and fewer jams,especially in summer
Improved Safety less⁤ traffic‍ pressure reduces accidents risks
Better Connectivity Easier access to hospital,local roads,and tourist areas
Economic Boost Improves conditions for tourism and commerce

Looking Ahead

With public ‍pressure mounting and political voices such as the Popular Party insisting on progress,the hope is that this vital infrastructure project will soon gain the momentum it requires. As Torrevieja‍ continues to grow as a tourist destination and ​residential hub, resolving the traffic woes caused by the N-332 bottleneck is becoming ever more⁢ urgent.

Residents and visitors‍ alike eagerly await concrete moves by the Ministry of Transport to fulfill its promise and set this expansive road⁢ project in motion.


References:

Share your love