- Maintenance work on the electrical network caused major traffic congestion on August 25, 2025, around San Javier and neighboring areas in Murcia.
- Key affected roads included the AP-7 highway and the N-332 road, impacting routes from San Javier to Torrevieja, San Pedro del Pinatar, and Pilar de la Horadada.
- The Dirección General de tráfico (DGT) implemented a temporary detour along RM-19 near Balsicas to ease traffic flow.
- Drivers experienced delays due to multiple traffic jams stretching several kilometers during peak hours.
- Authorities recommend checking traffic updates and using alternative routes when possible.
Electrical Maintenance Causes Traffic Chaos in San Javier and Surrounding Areas
On Monday, August 25, 2025, routine maintenance work on the electrical infrastructure generated notable traffic slowdowns and congestion across critical highways in the Murcia region, especially in the municipality of San Javier and nearby towns.
Which Roads were Impacted?
The Dirección General de Tráfico (DGT) reported that congestion spread along multiple main roads, including:
- AP-7 highway: Notably between kilometers 770.20 and 780.38, covering areas near San Pedro del Pinatar and Pilar de la Horadada.
- N-332 road: Sections between kilometers 31.89 and 33.44 in central San Javier and further stretches from Orihuela Costa to Torrevieja, including 48.73-49.26 km, 49.91-51.33 km, and 54-57.75 km.
Detour Set up to Alleviate Traffic
To minimize disruption, traffic authorities established an operative detour on the RM-19 route near Balsicas. This temporary measure aimed to divert vehicles away from the most affected areas, helping restore smoother traffic flow.
areas Most Affected by Delays
| Location | Road | Affected Kilometers |
|---|---|---|
| San Javier | N-332 | 31.89 – 33.44 |
| San Pedro del Pinatar | AP-7 | 777.16 – 780.38 |
| Pilar de la Horadada | AP-7 | 770.20 - 773.00 |
| Orihuela Costa – Torrevieja | N-332 | 48.73 – 49.26, 49.91 – 51.33, 54 – 57.75 |
Practical Tips for Commuters
- Plan Ahead: Check live traffic updates via the DGT website or local news before traveling.
- Use Alternative Routes: Whenever possible, use secondary roads or the detour via RM-19 near balsicas.
- Expect Delays: Allow extra travel time, especially during peak daytime hours.
- Stay Informed: Follow official channels for updates on maintenance work and traffic conditions.
Why Are Thes Maintenance Works Critically important?
While these maintenance activities may cause temporary inconveniences, they are crucial for the safety and reliability of the region’s electrical network. Proper upkeep prevents power outages and ensures a stable supply to homes and businesses.
According to the Dirección General de Tráfico report via La Verdad, the coordinated effort between administration bodies seeks to minimize traffic impacts while maintaining essential infrastructure.
Looking Ahead
Authorities are expected to continue electrical maintenance works in other areas throughout the coming months. Motorists are encouraged to keep an eye on traffic bulletins and municipal announcements. This proactive approach helps avoid unneeded delays and keeps the region’s transport network moving efficiently.
Sources:

