Summary
- The Torrevieja City Council has opened tender for the rehabilitation of the Salt Industry Interpretation Center.
- Project funded by the Next Generation EU Recovery Plan and coordinated by the Ministry of Industry and Tourism, Generalitat Valenciana, and regional tourism bodies.
- The renovation budget totals €511,476.92 with a five-month execution period.
- Designed by ROCAMORA Diseño y Arquitectura, focusing on new museographic routes interpreting Torrevieja’s salt extraction history.
- The center highlights local and global salt industry history through innovative interior and exterior design elements.
- Invitations to bid extended to eight specialized construction companies via a negotiated procedure.
Torrevieja Launches Rehabilitation Tender for Salt Industry Interpretation Center
On July 11, the Local Government Board (JGL) of the Torrevieja City Council approved the tender process for the restoration of the Centro de Interpretación de la Industria Salinera de Torrevieja. This initiative is funded by the Plan de Recuperación, Transformación y Resiliencia (NEXT GENERATION EU), under the 2021 Tourism Sustainability Plan and supervised by the Ministry of Industry and Tourism in collaboration with the Generalitat Valenciana and Turisme Comunitat Valenciana.
Key Details about the Project Tender
federico Alarcón, secretary of the Local Government Board, explained that the contract award will follow a negotiated procedure without publicity, after an initial open simplified procedure resulted deserted. This step responds to the project’s budget scale.
| Project Aspect | Details |
|---|---|
| Project Designer | ROCAMORA Diseño y Arquitectura, S.L.P. |
| Budget | €511,476.92 (VAT included) |
| Execution Time | 5 months |
| Location | Avenida de la Estación,Torrevieja |
| contract Type | Negotiated without publicity |
Participating Companies Invited to tender
Invitations with bid requests have been sent via the Public Procurement Platform to the following construction companies:
- Excavaciones Geos,S.L.
- Oserpro 2000, S.L.
- Solvenza Proyectos, Construcción y Servicios, S.L.
- ACSA Obras e Infraestructuras S.A.U.
- Abala infraestructuras, S.L.
- Caselles Valero, S.L.
- Construcciones Galysan, S.L.
- Zaragoza 2012 Grupo Constructor, S.L.U.
The New Vision for Torrevieja’s Salt Industry Interpretation Center
The Centro de Interpretación de la Industria Salinera is more than just a museum; it is a tribute to the symbiotic relationship between Torrevieja and its salt industry heritage. Torrevieja’s identity is deeply rooted in its maritime climate, the twin salt lagoons that frame the city, and the historic watchtower that lends the city its name.
A Ancient and Educational Journey
- Location and Symbolism: The center is housed in a historic building,an old train stop,connecting the city’s industrial past with its cultural future.
- Museographic Focus: The exhibits trace the history of salt extraction in Torrevieja-from the earliest evidence through industrialization to present-day processes.
- Global Context: Alongside local stories, the center presents global perspectives on salt production, highlighting different extraction methods and varieties worldwide.
Unique Architectural and Museographic Features
The design brings fresh life to this historic space, creating an immersive experience:
- Illuminated Access: Visitors enter through striking large illuminated letters on the façade that spell out the center’s name, making the building a city landmark.
- Interactive Outdoor Space: The initial area features glass panels with vinyl graphics narrating the foundation of the city and early salt production, alongside the original salt transport cart.
- Interior Layout: Visitors are welcomed in a reception area with controlled ceiling height, designed for comfort and orientation.
Two Themed Zones for a Thorough experience
The exhibition space is thoughtfully divided:
- zone 1: The history of salt extraction and the evolution of Torrevieja.
- Zone 2: Different salt extraction methods from around the world.
The interior resembles an elliptical plaza with irregular “salt rib” structures made of EPS, creating a journey through large glowing salt-like blocks. Explanatory panels,archaeological replicas,and multimedia rooms envelop visitors in the industry’s story.
Exterior Landscape and Accessibility
- The outdoor area is transformed into a “salt topography,” cleverly offsetting ground level changes and incorporating ramps.
- Artistic display of historic salt extraction boats and the “La Química” water reservoir add further context.
- The designed circuit provides a clear, linear route that ensures visitors experience the full narrative without losing orientation.
What This Means for Torrevieja and Visitors
This refurbished Center will:
- Serve as a key cultural and tourist attraction,reinforcing torrevieja’s maritime and industrial heritage.
- Help educate locals and visitors about the meaning of the salt industry,locally and globally.
- Support sustainable tourism aligned with EU recovery and regional progress goals.
With works expected to last five months upon contractor selection, the project promises to breathe new life into a historic gem of Torrevieja, enhancing community pride and visitor interest alike.
—

