Summary:

  • Torrevieja will ⁣add ⁣a second‍ heated indoor swimming pool at its Ciudad Deportiva sports⁣ complex.
  • The project budget for ‌drafting construction plans is set at €87,499 including VAT.
  • The‌ new pool will measure‌ 25 meters by 12.5 meters, ‍ideal for warming up and aquatic ⁤activities.
  • Designs ‍must ensure sustainable⁢ energy use and connect seamlessly with existing sports facilities and parking.
  • Outdoor areas including⁢ parking and gardens will be reorganized as part ⁤of the ‍project.
  • The pool will have indoor⁢ seating ⁣for users but ‍not for spectators.

Torrevieja to Expand Aquatic Sports with New Heated Indoor‌ Swimming Pool

Torrevieja is set to enhance its sports​ infrastructure‌ by adding a second heated indoor swimming pool to its Ciudad⁤ Deportiva complex. The City⁢ Council recently ‍approved the initiation of project planning for this new‍ facility, marking a notable step in ​supporting indoor aquatic‌ sports enthusiasts and encouraging sustainable energy use.

Project details​ and Budget

the local government has allocated a base budget⁣ of⁤ €87,499 (VAT included) to​ contract and complete the project’s drafting phase.Once finalized, ⁢the construction will⁢ commence, contributing to the existing ⁤amenities ‌at the sports⁢ city.

Specifications ‌of the New Pool

  • Dimensions: 25 meters long by ​12.5 meters wide
  • Primary uses: warm-up‌ sessions and various aquatic activities
  • Location: At the rear of the current Olympic-sized ⁣pool and parking ⁣area within the Ciudad Deportiva site

The​ new pool will ‍complement the existing Olympic pool, offering more opportunities⁣ for swimmers especially during colder months⁤ or for training purposes.

Integrated and Sustainable design Requirements

According⁤ to Councilor Diana box Alonso, the project must ensure:

  • Seamless connection between the new pool, the existing pool, ‌seven-a-side football fields, and parking zones.
  • Reorganization⁣ of exterior spaces,including parking layout and landscaping improvements.
  • use of sustainable energy solutions to heat the pool‍ water, utilizing ⁣the⁢ existing boiler ‍room shared with the current facilities.
  • Comfort features ⁣such as indoor⁣ rest areas ‍or seating, intended ⁣for users rather ⁣than spectators.

Why This Matters for Torrevieja

Swimming is a ⁢popular sport ‌and leisure‌ activity in ​Torrevieja,⁢ known for its healthy ⁣lifestyle ‌and vibrant community. The ⁢addition of this​ second heated ⁣pool⁢ will:

  • Increase​ accessibility to indoor swimming year-round.
  • Support training and recreational activities ‍for all ages and‌ skill ​levels.
  • Demonstrate torrevieja’s commitment ⁢to sustainability through eco-friendly energy choices.
  • Enhance ​the value and functionality of the Ciudad Deportiva for residents‌ and‍ visitors alike.

Timeline and What to‍ Expect Next

With the project’s contractual phase recently approved, the drafting of construction plans will soon ‌begin. the following ⁣steps ‌will include:

Phase Expected ⁤Duration Purpose
Project drafting 3-4 months Prepare detailed architectural and technical plans
Public Tender 1-2 months Select construction⁢ contractors
Construction 6-9 ⁢months (estimated) Build​ the new pool and ⁣reorganize exterior areas

residents, athletes, and visitors can look ⁤forward to a ⁣modern and environmentally friendly facility that enhances Torrevieja’s sports infrastructure.

Final Thoughts

As cities grow,investing in thorough​ sports facilities becomes vital for‌ community health⁤ and cohesion.⁣ Torrevieja’s addition of a second heated pool demonstrates forward-thinking ⁤planning ‍to promote aquatic sports and sustainable ‌growth in southeastern Spain.


Source: La Verdad – Torrevieja Ciudad Deportiva⁢ New Pool Project

Share your love