- Torrevieja will add a second heated indoor swimming pool at its Ciudad Deportiva sports complex.
- The project budget for drafting construction plans is set at €87,499 including VAT.
- The new pool will measure 25 meters by 12.5 meters, ideal for warming up and aquatic activities.
- Designs must ensure sustainable energy use and connect seamlessly with existing sports facilities and parking.
- Outdoor areas including parking and gardens will be reorganized as part of the project.
- The pool will have indoor seating for users but not for spectators.
Torrevieja to Expand Aquatic Sports with New Heated Indoor Swimming Pool
Torrevieja is set to enhance its sports infrastructure by adding a second heated indoor swimming pool to its Ciudad Deportiva complex. The City Council recently approved the initiation of project planning for this new facility, marking a notable step in supporting indoor aquatic sports enthusiasts and encouraging sustainable energy use.
Project details and Budget
the local government has allocated a base budget of €87,499 (VAT included) to contract and complete the project’s drafting phase.Once finalized, the construction will commence, contributing to the existing amenities at the sports city.
Specifications of the New Pool
- Dimensions: 25 meters long by 12.5 meters wide
- Primary uses: warm-up sessions and various aquatic activities
- Location: At the rear of the current Olympic-sized pool and parking area within the Ciudad Deportiva site
The new pool will complement the existing Olympic pool, offering more opportunities for swimmers especially during colder months or for training purposes.
Integrated and Sustainable design Requirements
According to Councilor Diana box Alonso, the project must ensure:
- Seamless connection between the new pool, the existing pool, seven-a-side football fields, and parking zones.
- Reorganization of exterior spaces,including parking layout and landscaping improvements.
- use of sustainable energy solutions to heat the pool water, utilizing the existing boiler room shared with the current facilities.
- Comfort features such as indoor rest areas or seating, intended for users rather than spectators.
Why This Matters for Torrevieja
Swimming is a popular sport and leisure activity in Torrevieja, known for its healthy lifestyle and vibrant community. The addition of this second heated pool will:
- Increase accessibility to indoor swimming year-round.
- Support training and recreational activities for all ages and skill levels.
- Demonstrate torrevieja’s commitment to sustainability through eco-friendly energy choices.
- Enhance the value and functionality of the Ciudad Deportiva for residents and visitors alike.
Timeline and What to Expect Next
With the project’s contractual phase recently approved, the drafting of construction plans will soon begin. the following steps will include:
| Phase | Expected Duration | Purpose |
|---|---|---|
| Project drafting | 3-4 months | Prepare detailed architectural and technical plans |
| Public Tender | 1-2 months | Select construction contractors |
| Construction | 6-9 months (estimated) | Build the new pool and reorganize exterior areas |
residents, athletes, and visitors can look forward to a modern and environmentally friendly facility that enhances Torrevieja’s sports infrastructure.
Final Thoughts
As cities grow,investing in thorough sports facilities becomes vital for community health and cohesion. Torrevieja’s addition of a second heated pool demonstrates forward-thinking planning to promote aquatic sports and sustainable growth in southeastern Spain.
Source: La Verdad – Torrevieja Ciudad Deportiva New Pool Project

