• The Torrevieja City ‍Council has approved upgrading two floors of the ⁢Centro Multiusos.
  • A total​ of 11 companies bid; INMOURBANA SERVICIOS S.L.U. won with ⁢a €153,536.90 contract.
  • The third floor will⁤ become a Youth Leisure Center with multifunctional rooms.
  • The fifth floor will be transformed into a Training Center with multiple classrooms.
  • Work will start after the signing of ⁣official ⁤documents ⁢and last approximately 3 months.
  • Adaptations include electrical,⁤ climate control, ⁣and fire protection system⁤ updates with modular, removable partitions.

Torrevieja Transforms Multiuse Center to Boost Youth Training and Leisure

the Torrevieja city Council is moving forward⁢ with ​plans to⁢ revamp ⁤two floors ⁣of the Centro Multiusos, creating dedicated spaces for youth leisure and training. This long-awaited renovation ​was ‍green-lit ⁤by the Junta de Gobierno Local (JGL) earlier today,awarding the construction contract to INMOURBANA SERVICIOS S.L.U. for ‍€153,536.90.The⁤ project marks an importent development for ⁣local youth programs.

Project Details and Timeline

The construction period is set for 3‍ months,‌ commencing shortly after the Acta de⁣ Replanteo ⁣is signed.The ⁢works will ⁢adapt the third and fifth⁢ floors to meet modern requirements for their new functions.

Third Floor: New youth Leisure Center

This floor will be redesigned with versatile, modular walls that allow flexible use of space. Facilities will include:

  • Assembly hall (119.50 m²)
  • multipurpose room (85.75 m²)
  • Activity room ⁢(103.70 m²)
  • Storage​ and ⁣service rooms
  • Circulation ⁣zones including ‍elevators, stairs,​ and ‍a freight elevator

Fifth Floor: Dedicated​ Training Center

The training center will have three ⁤classrooms ‌plus supporting spaces designed for educational activities:

Area Useful Surface ⁢(m²)
Classroom 1 71.65
Classroom 2 55.55
Classroom 3 50.95
Teachers’ Lounge 28.50
Reception /⁤ waiting Area 51.20
Storage 18.90

Modern and Adaptable Design

in addition⁢ to rearranging the space, the renovation will ⁢bring critically important upgrades‌ to the​ building’s electrical, air conditioning, and fire protection systems to ensure safety‍ and comfort. The chosen ‌mobile partition system‍ offers the flexibility to modify or⁢ revert​ room configurations, adapting to ⁢future needs without⁣ permanent ⁣structural changes.

community Impact

This ⁤project underlines Torrevieja’s commitment to⁤ providing youth with ⁤state-of-the-art facilities that foster both education and recreation.By investing in such spaces, ⁤the‌ city enhances⁢ the quality⁢ of life for ‍young residents and aligns with broader social development goals.

summary

  • location: ‌Centro Multiusos, Torrevieja
  • Contracted by: INMOURBANA SERVICIOS S.L.U.
  • Budget: €153,536.90
  • Duration: Approximately 3 months
  • Floors adapted: 3rd (Youth‍ Leisure), 5th‌ (Training Center)
  • Construction​ features: Modular walls, updated safety and electrical systems

Keep an​ eye on upcoming updates as these⁢ important‌ community spaces ​take shape for the betterment ‍of ⁤torrevieja’s ‍youth.