Summary
- N-332 bypass in Torrevieja faces severe traffic congestion every summer, reaching up to 55,000 vehicles daily.
- Popular Party (PP) urges Ministry of Transport to advance the project of expanding (doubling) the N-332 variant to ease traffic.
- Despite promises, the construction project and environmental impact study have not yet been approved or tendered.
- PP requests the inclusion of a specific budget line in the 2026 State Budget for the 7.68 km road expansion.
- conselleria of Habitat offers cooperation with local authorities to speed up project approvals and coordination.
Torrevieja’s N-332 Variant Faces Urgent Expansion Demand Amid Growing Summer Traffic Chaos
Every summer, the N-332 bypass crossing through Torrevieja, a key artery on Spain’s southeastern coast, turns into a traffic nightmare. With daily vehicle counts surpassing 55,000 during peak months,this stretch has become synonymous with frustrating,often gridlocked commutes.
According to Rosario Martínez Chazarra, spokesperson for the Popular Party (PP) in Torrevieja’s city council, the Ministry of Transport and Sustainable Mobility has yet to take significant steps toward addressing this critical congestion issue. Despite official assurances from transport Minister Óscar Puente to the town’s mayor, Eduardo Dolón, that the project would be tendered in 2025, progress remains stalled, leaving local residents and officials frustrated.
Current Challenges and Project Delays
- The existing section of the N-332 variant struggles under the weight of increasing vehicles, especially in summer.
- The approved environmental impact report supports doubling the roadway to alleviate bottlenecks.
- However, the final construction plan has yet to be drafted or approved, delaying the tendering of a €55 million project for a 4.77 km segment.
- No progress has been reported on the additional 2.91 km section, totaling the planned 7.68 km expansion that the PP demands.
This lack of advancement calls into question the ministry’s commitments, as highlighted by the PP’s motion presented at the city council plenary session. The motion urges the Ministry to:
- Submit the expansion project details promptly to the Torrevieja City Council.
- Include connectivity improvements for junctions with the CV-95, the Hospital of Torrevieja, Salinas, and CV-905 roads.
- Quickly tender the preliminary project and environmental studies for excluded road segments.
- Allocate specific funding in the 2026 State Budget for the full 7.68 km doubling of the N-332 bypass.
The Role of Regional Authorities in Facilitating the Project
In a positive development, the Conselleria of Environment, Water, Infrastructure, and Territory has offered to actively coordinate with the city council and local road authorities to expedite related administrative procedures.As it manages the CV-95 and CV-905 roads connecting with the N-332, this collaboration aims to smooth any obstacles potentially delaying the project.
Why the N-332 Expansion Matters
The N-332 coastal road is a vital link for residents, tourists, and businesses in the Vega Baja region. Its current capacity limitations not only cause daily headaches for drivers but also impact emergency services, commercial transport, and the overall regional economy.
| Key Facts | Details |
|---|---|
| Current Traffic Volume | Up to 55,000 vehicles/day in summer |
| Project Length | 7.68 km (full doubling of variant) |
| Estimated Cost | €55 million for 4.77 km segment |
| pending Steps | Project approval, tender declaration, environmental permissions |
Looking Ahead
The expansion of the N-332 bypass is essential to improve traffic flow, road safety, and regional connectivity in Torrevieja and the broader Vega Baja area.With summer months becoming more congested and the State Budget 2026 on the horizon, the spotlight is on the Ministry of Transport to fulfill its promises and accelerate the project.
Collaboration between local authorities,regional bodies,and the central government will be key to overcoming bureaucratic delays and ensuring this major infrastructure upgrade moves forward without further setbacks.
Stay tuned for updates as this vital project develops, promising smoother journeys and better connectivity for one of Spain’s busiest coastal corridors.
Meta Title: Urgent Expansion Needed for N-332 Bypass in Torrevieja to end Summer Traffic Chaos
Meta Description: Severe summer traffic jams on Torrevieja’s N-332 variant demand urgent doubling of the road. The Popular Party calls on the Ministry of Transport for immediate action and budget allocation.

